C.1 Later

The Later scheduling option lets you to run the job at a specific date and time. By default, the current date and time are displayed.

Select Later to run the job at a specific date and time (either typed manually in mm/dd/yyyy hh:mm AM|PM format, or selected from the pop-up calendar)

To change the date, do any of the following:

To change the time, manually specify the time in the hh:mm AM or PM format.