C.16 Transformation Phases

The Transformation Phases are options in the Transformation Plan workflow. The Workloads list displays the Transformation Phase in the Status column. You can set the transformation phase manually by using the Workload dialog for a single workload or the Bulk Status Change dialog for one or more selected workloads.

  • Ready to be Imported

  • Imported

  • Needs Additional Info

  • Ready to Submit

  • Submitted, Waiting for Start Date

  • Ready to Transform

  • Transforming

  • Transformation Failed

  • Pre-Cutover Testing

  • Pre-Cutover Testing Failed

  • Pre-Cutover Testing Succeeded

  • Ready to Cut Over, Waiting for Cutover Date

  • Ready to Cut Over

  • Cut Over

  • Post-Cutover Testing

  • Post-Cutover Testing Failed

  • Post-Cutover Testing Succeeded

  • Completed

  • Reopened

  • Withdrawn

  • Error