C.1 Later

The Later scheduling option lets you to run the job at a specific date and time. By default, the current date and time are displayed.

Select Later to run the job at a specific date and time (either type manually in mm/dd/yyyy hh:mm AM|PM format, or select from the pop-up calendar).

To change the date, do any of the following:

  • Click the drop-down list, then select the desired date in the calender.

  • Manually enter the date in the mm/dd/yy format.

To change the time, manually specify the time in the hh:mm AM or PM format.